Tsentralnye MES

English

Tsentralnye MES branch of KEGOC was established  in 1997.

Head of Branch – Tuleu Tyakov.

The main objectives of the branch are:

• Transmit electric power and energy through electricity networks from the busses of substations and power stations in the fixed volumes and conditions given by the NDC SO;

• Prepare optimal scheme of electricity grids in terms of reliability and economy.

«Central Intersystem Transmission grids» is located in Karaganda region. The branch’s grids are parts of Kazakhstan EEC (European Economic Community) and connected by the intersystem PTL (Power Transmission Line) with the next branch’s electricity grids:  «Akmolinskiy ITG (Intersystem Transmission grids)», «Severny ITG», «Almatinskiy ITG», «Shymkentskiy ITG».

Power suppliers:  powers stations of national value (Karagandy GRES-2), regional value (Karagandy GRES -1 and Karagandy TPP-3 (Turbine Power Plants), Zhezkasgan and Balhash TPP, powers stations of local value (Karagandy TPP-1, Karagandy TPP-2 , JSC «Arcelor Metal Temirtau»,   «Shahtinskteploenergo» , GTES «Kumkol», GTES «Akshabulak», solar power stations «Saran», «Gulshat», «Agadyr-1», «Kengir»).

The property of the branch includes overhead transmission lines in overhead clearance 10 – 500 kV with total length 3482.19 km (in circuits) and also 10 substations with 220 – 500 kV, with total power of 3741.6 MVA.  

The staff number is 412 employees.

Contact 

4, Kamskaya Str., Karaganda, 100014, Republic of Kazakhstan

Contact phone: +7 (7212) 421-365, 

Fax: +7 (7212) 421-370